Echo by Spyre Construction Update
Echo by Spyre, Tugun
October Construction Update
30 October, 2026
We are delighted to provide you with the monthly construction update at Echo by Spyre for October 2026.
Mostly notably this month;
Ground Floor
Rebates are being prepared and waterproofing is underway, ready for the windows to be installed.
High-level services (plumbing, electrical and mechanical work that goes in before framing) are now being installed.
Framing has begun.
Joinery shop drawings underway.
Level 2
Formwork has been stripped.
Rebates are being prepared, following the same process as the ground floor.
High-level services will begin shortly.
Level 4
Level 4 has now been poured.