We are delighted to provide you with the monthly construction update at Echo by Spyre for August 2026.
Mostly notably this month;
The basement ramp has now been poured.
The ground floor slab has been poured.
The level two slab is scheduled to be poured by the end of the month.
Scaffolding has commenced around the perimeter of the premises.
The site shed has been installed.
The gantry has been installed.